Council Implementing Decision (EU) 2026/1776 of 10 July 2026 authorising Belgium to apply a reduced rate of taxation to electricity directly supplied to vessels berthed in ports, in accordance with Article 19 of Directive 2003/96/EC

European Union har publisert et vedtak om «Council Implementing Decision (EU) 2026/1776 of 10 July 2026 authorising Belgium to apply a reduced rate of taxation to electricity directly supplied to vessels berthed in ports, in accordance with Article 19 of Directive 2003/96/EC».

European UnionVedtattEU

Council Implementing Decision (EU) 2026/1440 of 25 June 2026 authorising Germany to apply a reduced rate of taxation to electricity directly supplied to vessels berthed in ports, in accordance with Article 19 of Directive 2003/96/EC

European Union har publisert et vedtak om «Council Implementing Decision (EU) 2026/1440 of 25 June 2026 authorising Germany to apply a reduced rate of taxation to electricity directly supplied to vessels berthed in ports, in accordance with Article 19 of Directive 2003/96/EC».

European UnionVedtattEU

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL amending Regulation (EU) 2017/1369 and Regulation (EU) 2020/740 as regards simplification and better use of digital options for energy and tyre labelling

European Commission har publisert «Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL amending Regulation (EU) 2017/1369 and Regulation (EU) 2020/740 as regards simplification and better use of digital options for energy and tyre labelling».

European CommissionForslagEU

PC_2022_EG_09 - Public Consultation on the new framework guidelines on scenarios for network development planning

PC_2022_EG_09 - Public Consultation on the new framework guidelines on scenarios for network development planning Status Closed Open: 06.10.2022 Close: 14.11.2022 Policy area TEN-E, energy infrastructure planning Contact information scenario.guidelines@acer.europa.eu Audience Interested stakeholders Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2025_G_04 - Public consultation on the ACER gas TSO cost efficiency comparison draft methodology

PC_2025_G_04 - Public consultation on the ACER gas TSO cost efficiency comparison draft methodology Status Closed Open: 17.06.2025 Close: 17.07.2025 Policy area Gas transmission Contact information AEC@acer.europa.eu Audience Gas Transmission System Operators (TSOs), investors, market participants from wholesale and retail, Member State public authorities, academics, thinktanks, civic society and other interested parties.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2026_E_04 - Public consultation on economic input data for European electricity system modelling

PC_2026_E_04 - Public consultation on economic input data for European electricity system modelling Status Closed Open: 27.02.2026 Close: 10.04.2026 Policy area Security of supply, energy system modelling and planning Contact information SecurityOfSupply@acer.europa.eu Audience Energy companies, energy industry associations, national energy regulators, electricity transmission system operators, academic and research institutions Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2019_E_10_Public Consultation on the Agency draft Opinion providing technical guidance on the calculation of the values related to CO2 Emission Limits in Capacity Mechanisms

PC_2019_E_10_Public Consultation on the Agency draft Opinion providing technical guidance on the calculation of the values related to CO2 Emission Limits in Capacity Mechanisms Status Closed Open: 24.09.2019 Close: 22.10.2019 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2023_E_04 - Public consultation on amendments to the methodology for calculating scheduled exchanges resulting from single day-ahead coupling

PC_2023_E_04 - Public consultation on amendments to the methodology for calculating scheduled exchanges resulting from single day-ahead coupling Status Closed Open: 01.03.2023 Close: 29.03.2023 Policy area Day-ahead electricity market coupling Contact information ACER-ELE-2023-003@ACER.europa.eu Audience Transmission System Operators (TSOs), Nominated Electricity Market Operators (NEMOs), market participants, regulators, governments and other relevant stakeholders in the EU and EEA Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2024_E_04 - Public consultation on the implementation of co-optimisation in the electricity day-ahead coupling algorithm

PC_2024_E_04 - Public consultation on the implementation of co-optimisation in the electricity day-ahead coupling algorithm Status Closed Open: 27.05.2024 Close: 19.06.2024 Policy area Electricity, capacity allocation and congestion management, electricity balancing Contact information ACER-ELE-2023-014@acer.europa.eu Audience Market participants, nominated electricity market operators, transmission system operators, regulatory authorities, academics in the EU and EEA Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2023_E_05 - Public Consultation on the ACER Decision on harmonised allocation rules for long-term electricity transmission rights

PC_2023_E_05 - Public Consultation on the ACER Decision on harmonised allocation rules for long-term electricity transmission rights Status Closed Open: 29.08.2023 Close: 26.09.2023 Policy area Electricity, Forward capacity allocation Contact information ACER-ELE-2023-007@acer.europa.eu Audience Interested stakeholders in the EU and EEA Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

Proposal for a COUNCIL DECISION authorising the Republic of Lithuania and the Republic of Poland to become parties to the Convention on Supplementary Compensation for Nuclear Damage and its amendment in the interest of the European Union and to make a declaration on the application of the relevant internal rules of Union law

European Commission har publisert «Proposal for a COUNCIL DECISION authorising the Republic of Lithuania and the Republic of Poland to become parties to the Convention on Supplementary Compensation for Nuclear Damage and its amendment in the interest of the European Union and to make a declaration on the application of the relevant internal rules of Union law».

European CommissionForslagEU

PC_2025_G_01 - Public consultation on inter-temporal cost allocation mechanisms for financing hydrogen infrastructure

PC_2025_G_01 - Public consultation on inter-temporal cost allocation mechanisms for financing hydrogen infrastructure Status Closed Open: 10.03.2025 Close: 31.03.2025 Policy area Hydrogen Contact information PC_ICA@acer.europa.eu Audience Hydrogen network operators (HNOs), gas transmission system operators (TSOs), gas distribution system operators (DSOs), energy exchanges, energy traders, investors in hydrogen production and consumption technologies, hydrogen users, financing institutions, Member State public authorities, academics, think tanks, civil society and other interested parties.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2026_R_07 - Public consultation on a new guideline on REMIT transaction reporting

PC_2026_R_07 - Public consultation on a new guideline on REMIT transaction reporting Status Closed Open: 16.04.2026 Close: 12.06.2026 Policy area REMIT Contact information REMIT.Consultations@acer.europa.eu Audience Interested stakeholders, including but not limited to market participants, national regulatory authorities (NRAs), registered reporting mechanisms (RRMs), inside information platforms (IIPs) and organised marketplaces (OMPs).

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2020_E_04 - Public consultation on the methodology establishing a list of standard products for balancing capacity for frequency restoration and replacement reserves

PC_2020_E_04 - Public consultation on the methodology establishing a list of standard products for balancing capacity for frequency restoration and replacement reserves Status Closed Open: 17.02.2020 Close: 10.03.2020 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2020_E_08 - Public Consultation on the methodology and assumptions that are to be used in the bidding zone review process and for the alternative bidding zone configurations to be considered

PC_2020_E_08 - Public Consultation on the methodology and assumptions that are to be used in the bidding zone review process and for the alternative bidding zone configurations to be considered Status Closed Open: 31.03.2020 Close: 24.04.2020 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2014_R_05 & PC_2014_R_06 - Public consultation on ACER’s Transaction Reporting User Manual (TRUM) and RRM Requirements for transaction reporting under REMIT

PC_2014_R_05 & PC_2014_R_06 - Public consultation on ACER’s Transaction Reporting User Manual (TRUM) and RRM Requirements for transaction reporting under REMIT Status Closed Open: 22.07.2014 Close: 02.09.2014 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2026_E_03 - Public consultation on the amendments to the Core region's long-term capacity calculation methodology

PC_2026_E_03 - Public consultation on the amendments to the Core region's long-term capacity calculation methodology Status Closed Open: 27.02.2026 Close: 27.03.2026 Policy area Forward capacity allocation, capacity calculation, electricity bidding zone borders Contact information ACER-ELE-2026-001@acer.europa.eu Audience Transmission system operators (TSOs), electricity industry, traders, national regulators, governments and other relevant stakeholders in the EU Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2026_G_06 - Public consultation on amendments to the gas network code on interoperability and data exchange

PC_2026_G_06 - Public consultation on amendments to the gas network code on interoperability and data exchange Status Closed Open: 20.04.2026 Close: 10.06.2026 Policy area Gas markets, cross-border trade & infrastructure, renewable & low-carbon gases integration Contact information int_im@acer.europa.eu Audience Gas transmission system operators; network users (including shippers, traders and suppliers); national regulatory authorities; virtual trading point and capacity booking platform operators; industry associations; gas and hydrogen producers; consumer and environmental organisations; academia and research institutions; other interested stakeholders.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2020_E_11 - Public consultation on all TSOs proposal for the methodology for sharing costs incurred to ensure firmness and remuneration of long-term transmission rights

PC_2020_E_11 - Public consultation on all TSOs proposal for the methodology for sharing costs incurred to ensure firmness and remuneration of long-term transmission rights Status Closed Open: 22.06.2020 Close: 12.07.2020 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

Observations to public notice on the incremental capacity project proposal on the cross-border point at Mosonmagyaróvár of the transmission line (HUAT)

Observations to public notice on the incremental capacity project proposal on the cross-border point at Mosonmagyaróvár of the transmission line (HUAT) Status Closed Open: 20.11.2018 Close: 18.01.2019 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2022_E_04 - Public consultation on the possible developments of the EU electricity forward market

PC_2022_E_04 - Public consultation on the possible developments of the EU electricity forward market Status Closed Open: 01.06.2022 Close: 29.07.2022 Policy area EU Electricity Forward Market Contact information Audience Market participants interested to hedge (producers, consumers, traders) Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

TC_2025_G_07 - Targeted consultation on EU DSO Entity’s draft statutory documents updated to include gas and hydrogen

TC_2025_G_07 - Targeted consultation on EU DSO Entity’s draft statutory documents updated to include gas and hydrogen Status Closed Open: 21.11.2025 Close: 19.12.2025 Policy area Electricity, gas and hydrogen distribution networks Contact information ACER-DSO-2025@acer.europa.eu Audience Targeted consultation: Organisations representing all stakeholders, particularly distribution system users (including consumers).

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2024_E_07 - Public consultation on the draft network code on demand response

PC_2024_E_07 - Public consultation on the draft network code on demand response Status Closed Open: 05.09.2024 Close: 31.10.2024 Policy area Electricity markets, demand response Contact information ACER-ELE-2024-008@acer.europa.eu Audience Electricity Transmission System Operators (TSOs), electricity Distribution System Operators (DSOs), Regional Coordination Centres (RCCs), Nominated Electricity Market Operators (NEMOs), investors, network users, producers, suppliers, new market players, exchanges, balancing providers, public authorities, academics, think tanks, environmental groups, civic society and other interested parties.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2015_G_04 - Public Consultation on the methodology for implementation monitoring and evaluation of the impact of the gas Network Codes and Guidelines on the internal gas market

PC_2015_G_04 - Public Consultation on the methodology for implementation monitoring and evaluation of the impact of the gas Network Codes and Guidelines on the internal gas market Status Closed Open: 12.06.2015 Close: 10.07.2015 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2022_E_11 - Public Consultation on amendments to the definition of capacity calculation regions to include Norway

PC_2022_E_11 - Public Consultation on amendments to the definition of capacity calculation regions to include Norway Status Closed Open: 28.10.2022 Close: 25.11.2022 Policy area Capacity calculation regions (CCRs); electricity bidding zone borders Contact information ACER-ELE-2022-018@acer.europa.eu Audience Transmission System Operators (TSOs), electricity industry, traders, regulators, governments and other relevant stakeholders in the EU and EEA Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2024_E_05 - Public consultation on the amendments to the electricity grid connection network code

PC_2024_E_05 - Public consultation on the amendments to the electricity grid connection network code Status Closed Open: 17.06.2024 Close: 08.09.2024 Policy area Electricity grid connection Contact information ACER-ELE-2022-015@acer.europa.eu Audience Electricity Transmission System Operators (TSOs), network users, producers, suppliers, new market players, public authorities, academics, think tanks, environmental groups, civic society and other interested parties.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2024_E_11 - Public consultation on NL-NO hedging opportunities

PC_2024_E_11 - Public consultation on NL-NO hedging opportunities Status Closed Open: 25.10.2024 Close: 22.11.2024 Policy area Electricity, forward capacity allocation Contact information ACER-ELE-2024-011@acer.europa.eu Audience Market participants, Nominated Electricity Market Operators, Transmission System Operators, National Regulatory Authorities, academics in the EU and EEA Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2026_E_05 - Public consultation on developments and initiatives in the EU Power Purchase Agreements market

PC_2026_E_05 - Public consultation on developments and initiatives in the EU Power Purchase Agreements market Status Closed Open: 31.03.2026 Close: 08.05.2026 Policy area Electricity market regulation Contact information PPA.assessment@acer.europa.eu Audience Buyers and sellers of PPAs, public authorities, consumers and industry associations, legal and advisory professionals, information providers and market analysts, academics, think tanks, consultancy firms and civil society.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2012_E_12 on ACER Guidance Note on Consultation

PC_2012_E_12 on ACER Guidance Note on Consultation Status Closed Open: 03.08.2012 Close: 30.09.2012 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2019_E_13 - Public Consultation on the proposal made by all Transmission System Operators on the pricing methodology for balancing energy and cross-zonal capacity

PC_2019_E_13 - Public Consultation on the proposal made by all Transmission System Operators on the pricing methodology for balancing energy and cross-zonal capacity Status Closed Open: 28.10.2019 Close: 18.11.2019 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2024_E_02_Public consultation on the amendments to the automatic frequency restoration reserve implementation framework and pricing methodology

PC_2024_E_02_Public consultation on the amendments to the automatic frequency restoration reserve implementation framework and pricing methodology Status Closed Open: 26.03.2024 Close: 23.04.2024 Policy area Electricity, electricity balancing, balancing platforms Contact information ACER-ELE-2024-003@acer.europa.eu Audience Electricity (cross-border/trading/balancing), electricity transmission system operators (TSOs), market participants, regulatory authorities, academics and other interested parties Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2021_E_04 Public Consultation on the Draft Framework Guideline on sector-specific rules for cybersecurity aspects of cross-border electricity flows

PC_2021_E_04 Public Consultation on the Draft Framework Guideline on sector-specific rules for cybersecurity aspects of cross-border electricity flows Status Closed Open: 30.04.2021 Close: 29.06.2021 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2019_E_07 - Public Consultation on the views and information from stakeholders regarding the amendments of the regional design of long-term transmission rights (‘LTTR’) for the Core region

PC_2019_E_07 - Public Consultation on the views and information from stakeholders regarding the amendments of the regional design of long-term transmission rights (‘LTTR’) for the Core region Status Closed Open: 01.08.2019 Close: 30.08.2019 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2026_E_02 - Public consultation on the amendment to the implementation frameworks for two European electricity balancing platforms

PC_2026_E_02 - Public consultation on the amendment to the implementation frameworks for two European electricity balancing platforms Status Closed Open: 26.01.2026 Close: 23.02.2026 Policy area Electricity balancing Contact information ACER-ELE-2025-012@acer.europa.eu Audience Market participants, balance service providers, electricity transmission system operators, government and regulatory authorities, aggregators and flexibility service providers, industry associations and other interested parties Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

TC_2023_E_01 - Targeted consultation on draft amendments to ENTSO-E's association documents

TC_2023_E_01 - Targeted consultation on draft amendments to ENTSO-E's association documents Status Closed Open: 03.02.2023 Close: 17.02.2023 Policy area Electricity Contact information ACER-ELE-2023-01@acer.europa.eu Audience Targeted consultation: Organisations representing all stakeholders, in particular the system users, including customers.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2024_G_10 - Public consultation on the draft statutory documents of the European Network of Network Operators for Hydrogen

PC_2024_G_10 - Public consultation on the draft statutory documents of the European Network of Network Operators for Hydrogen Status Closed Open: 23.09.2024 Close: 21.10.2024 Policy area Hydrogen, gas Contact information Audience Organisations representing all stakeholders, in particular hydrogen system users, including customers (as per Article 57(9) of Regulation (EU) 2024/1789).

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2024_G_09 - Public consultation on amending the network code on capacity allocation mechanisms in gas transmission systems

PC_2024_G_09 - Public consultation on amending the network code on capacity allocation mechanisms in gas transmission systems Status Closed Open: 26.09.2024 Close: 25.10.2024 Policy area Gas Capacity Allocation Mechanism Network Code Contact information gas_cam_nc@acer.europa.eu Audience Energy suppliers, gas distribution system operators, network users, traders, gas industry, gas consumer representative groups, hydrogen providers or users, Member State public authorities, academics, think tanks, civic society and other interested parties.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2025_R_06 - Public consultation to amend the REMIT market participant registration format and the CEREMP platform

PC_2025_R_06 - Public consultation to amend the REMIT market participant registration format and the CEREMP platform Status Closed Open: 01.10.2025 Close: 12.11.2025 Policy area REMIT Contact information remit@acer.europa.eu Audience Interested stakeholders, including but not limited to market participants, national regulatory authorities (NRAs), registered reporting mechanisms (RRMs), inside information platforms (IIPs) and organised marketplaces (OMPs).

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2023_E_08 - Public Consultation on the ACER electricity cross-border capacity report

PC_2023_E_08 - Public Consultation on the ACER electricity cross-border capacity report Status Closed Open: 21.07.2023 Close: 22.09.2023 Policy area Electricity Contact information maczt-monitoring@acer.europa.eu Audience Interested stakeholders, including market participants, regulatory authorities, nominated electricity market operators, Member State governments, academics, grid system operators Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2014_O_01 - European Energy Regulation: A Bridge to 2025

PC_2014_O_01 - European Energy Regulation: A Bridge to 2025 Status Closed Open: 29.04.2014 Close: 16.06.2014 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2015_G_01 - ​Public Consultation on the Oil & Gas UK proposal to amend the Gas Network Codes CAM and BAL in order to retain the UK Gas Day

PC_2015_G_01 - ​Public Consultation on the Oil & Gas UK proposal to amend the Gas Network Codes CAM and BAL in order to retain the UK Gas Day Status Closed Open: 19.01.2015 Close: 09.02.2015 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2024_E_01 - Public consultation on amending the electricity price coupling algorithm methodology

PC_2024_E_01 - Public consultation on amending the electricity price coupling algorithm methodology Status Closed Open: 18.01.2024 Close: 20.02.2024 Policy area Electricity, capacity allocation and congestion management, electricity balancing Contact information ACER-ELE-2023-014@acer.europa.eu Audience Market participants, nominated electricity market operators, transmission system operators, regulatory authorities, academics in the EU and EEA Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2012_G_14 - Public Consultation on ​Draft Framework Guidelines on rules regarding harmonised transmission tariff structures for gas

PC_2012_G_14 - Public Consultation on ​Draft Framework Guidelines on rules regarding harmonised transmission tariff structures for gas Status Closed Open: 05.09.2012 Close: 05.11.2012 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2024_E_06 - Public consultation on the introduction of voluntary templates for Power Purchase Agreements in the EU energy market

PC_2024_E_06 - Public consultation on the introduction of voluntary templates for Power Purchase Agreements in the EU energy market Status Closed Open: 20.06.2024 Close: 18.07.2024 Policy area Electricity market regulation Contact information PPA.assessment@acer.europa.eu Audience Energy producers, utility companies, traders, off-takers/corporate energy buyers, legal services, advisory services, TSOs, DSOs, NEMOs, portfolio managers, academia, think tanks, and others.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

Proposal for a COUNCIL IMPLEMENTING DECISION authorising Belgium to apply a reduced rate of taxation to electricity directly supplied to vessels at berth in a port in accordance with Article 19 of Directive 2003/96/EC

European Commission har publisert «Proposal for a COUNCIL IMPLEMENTING DECISION authorising Belgium to apply a reduced rate of taxation to electricity directly supplied to vessels at berth in a port in accordance with Article 19 of Directive 2003/96/EC».

European CommissionForslagEU

​PC_2018_E_02 - Public consultation on the compliance of the all NEMOs’ proposal for the Price Coupling Algorithm and Continuous Trading Matching Algorithm with the CACM Regulation

​PC_2018_E_02 - Public consultation on the compliance of the all NEMOs’ proposal for the Price Coupling Algorithm and Continuous Trading Matching Algorithm with the CACM Regulation Status Closed Open: 26.04.2018 Close: 18.05.2018 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2026_R_01 - Public consultation on assessing the usefulness of ISO 20022 standard for REMIT exposure data reporting

PC_2026_R_01 - Public consultation on assessing the usefulness of ISO 20022 standard for REMIT exposure data reporting Status Closed Open: 12.01.2026 Close: 09.02.2026 Policy area REMIT Contact information remit@acer.europa.eu Audience Interested stakeholders, including but not limited to Market Participants (MPs), Registered Reporting Mechanisms (RRMs), Transmission System Operators (TSOs), Distribution System Operators (DSOs), Storage System Operators (SSOs), and LNG System Operators (LSOs).

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2023_EG_03 - Public consultation on the update of ACER cross-border cost allocation (CBCA) Recommendation

PC_2023_EG_03 - Public consultation on the update of ACER cross-border cost allocation (CBCA) Recommendation Status Closed Open: 23.02.2023 Close: 31.03.2023 Policy area TEN-E, cross-border, CBCA Contact information Stefano.ASTORRI@acer.europa.eu Audience All stakeholders Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2019_E_01 - Public consultation on the proposed methodologies for Coordinating Operational Security Analysis and for Relevant Asset Outage Coordination in electricity

PC_2019_E_01 - Public consultation on the proposed methodologies for Coordinating Operational Security Analysis and for Relevant Asset Outage Coordination in electricity Status Closed Open: 25.01.2019 Close: 18.02.2019 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2020_E_16_Public consultation on two methodologies for coordination of operational security and remedial actions in the Core capacity calculation region

PC_2020_E_16_Public consultation on two methodologies for coordination of operational security and remedial actions in the Core capacity calculation region Status Closed Open: 04.09.2020 Close: 21.09.2020 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2019_G_06_Public Consultation on The Bridge beyond 2025

PC_2019_G_06_Public Consultation on The Bridge beyond 2025 Status Closed Open: 23.07.2019 Close: 09.09.2019 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2022_E_07 - Public consultation on the revision of maximum and minimum electricity price methodologies

PC_2022_E_07 - Public consultation on the revision of maximum and minimum electricity price methodologies Status Closed Open: 19.09.2022 Close: 09.10.2022 Policy area Maximum and minimum prices in the day-ahead and intraday electricity markets Contact information thomas.kawam@acer.europa.eu Audience Interested stakeholders Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2019_E_11 - Public Consultation on all NEMOs’ proposal for the Methodology for price coupling algorithm and continuous trading matching algorithm

PC_2019_E_11 - Public Consultation on all NEMOs’ proposal for the Methodology for price coupling algorithm and continuous trading matching algorithm Status Closed Open: 20.10.2019 Close: 17.11.2019 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2021_E_02 Public consultation on the cross-border capacity allocation methodologies for the exchange of balancing capacity in the Hansa, Core and Baltic regions

PC_2021_E_02 Public consultation on the cross-border capacity allocation methodologies for the exchange of balancing capacity in the Hansa, Core and Baltic regions Status Closed Open: 12.04.2021 Close: 02.05.2021 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2018_G_03 - ​​PUBLIC CONSULTATION AS PART OF AGENCY DECISION MAKING PROCESS FOR THE SELECTION OF SINGLE CAPACITY BOOKING PLATFORM(S) AT 'MALLNOW' AND 'GCP VIP' (Article 37(3) CAM NC)

PC_2018_G_03 - ​​PUBLIC CONSULTATION AS PART OF AGENCY DECISION MAKING PROCESS FOR THE SELECTION OF SINGLE CAPACITY BOOKING PLATFORM(S) AT 'MALLNOW' AND 'GCP VIP' (Article 37(3) CAM NC) Status Closed Open: 05.06.2018 Close: 27.06.2018 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2025_E_02 - Public consultation on the impact of peak-shaving products on the EU electricity market under normal market conditions

PC_2025_E_02 - Public consultation on the impact of peak-shaving products on the EU electricity market under normal market conditions Status Closed Open: 20.03.2025 Close: 17.04.2025 Policy area Electricity market regulation Contact information peakshaving.assessment@acer.europa.eu Audience Energy producers, utility companies, traders, off-takers/corporate energy buyers, legal services, advisory services, TSOs, DSOs, NEMOs, portfolio managers, academia, think tanks, and other interested parties.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

​PC_2018_E_04 - Public consultation on the compliance of the Fallback Procedures proposed by the TSOs of the Core region with the CACM Regulation

​PC_2018_E_04 - Public consultation on the compliance of the Fallback Procedures proposed by the TSOs of the Core region with the CACM Regulation Status Closed Open: 01.08.2018 Close: 24.08.2018 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2024_E_08 - Public consultation on amending the harmonised electricity cross-zonal capacity allocation methodology

PC_2024_E_08 - Public consultation on amending the harmonised electricity cross-zonal capacity allocation methodology Status Closed Open: 16.09.2024 Close: 14.10.2024 Policy area Electricity balancing Contact information ACER-ELE-2024-010@acer.europa.eu Audience Electricity Transmission System Operators (TSOs), Regional Coordination Centres (RCCs), Nominated Electricity Market Operators (NEMOs), balancing providers, regulatory authorities and other interested parties.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

​​​​PC_2018_E_06 - Public consultation on the amendments of the proposal for common capacity calculation methodology for the Core region

​​​​PC_2018_E_06 - Public consultation on the amendments of the proposal for common capacity calculation methodology for the Core region Status Closed Open: 03.12.2018 Close: 24.12.2018 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2023_G_09 - Public consultation on the Capacity Allocation Mechanisms Network Code: achievements and the way forward

PC_2023_G_09 - Public consultation on the Capacity Allocation Mechanisms Network Code: achievements and the way forward Status Closed Open: 14.11.2023 Close: 05.01.2024 Policy area Gas network code Contact information gas_cam_nc@acer.europa.eu Audience Gas Transmission System Operators (TSOs), investors, market participants from wholesale and retail (including traders, producers, suppliers, gas storage operators), Member State public authorities, academics, thinktanks and other interested parties.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2012_R_10 - ​​Public consultation on Recommendations to the European Commission as regards the records of wholesale energy market transations according to REMIT

PC_2012_R_10 - ​​Public consultation on Recommendations to the European Commission as regards the records of wholesale energy market transations according to REMIT Status Closed Open: 21.06.2012 Close: 31.07.2012 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2013_G_03 - Public Consultation on Draft Framework Guidelines on rules regarding harmonised transmission tariff structures for gas

PC_2013_G_03 - Public Consultation on Draft Framework Guidelines on rules regarding harmonised transmission tariff structures for gas Status Closed Open: 18.07.2013 Close: 17.09.2013 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

Proposal for a COUNCIL IMPLEMENTING DECISION authorising Germany to apply a reduced rate of taxation to electricity directly provided to vessels at berth in a port, in accordance with Article 19 of Directive 2003/96/EC

European Commission har publisert «Proposal for a COUNCIL IMPLEMENTING DECISION authorising Germany to apply a reduced rate of taxation to electricity directly provided to vessels at berth in a port, in accordance with Article 19 of Directive 2003/96/EC».

European CommissionForslagEU

PC_2023_E_02 - Public Consultation on the ACER Decisions on proposals for a harmonised cross-zonal capacity allocation methodology and RCCs' tasks of sizing and procurement

PC_2023_E_02 - Public Consultation on the ACER Decisions on proposals for a harmonised cross-zonal capacity allocation methodology and RCCs' tasks of sizing and procurement Status Closed Open: 13.04.2023 Close: 15.05.2023 Policy area Integration of balancing capacity markets, sharing of reserves, day-ahead electricity market, allocation of cross-zonal capacity.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2020_G_19 Public Consultation to assess the possibility of setting a cap for multipliers for day-ahead and within-day capacity products

PC_2020_G_19 Public Consultation to assess the possibility of setting a cap for multipliers for day-ahead and within-day capacity products Status Closed Open: 17.11.2020 Close: 09.12.2020 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2025_E_03 - Public consultation on the amendment of harmonised allocation rules for long-term electricity transmission rights

PC_2025_E_03 - Public consultation on the amendment of harmonised allocation rules for long-term electricity transmission rights Status Closed Open: 24.04.2025 Close: 22.05.2025 Policy area Forward Capacity Allocation Contact information ACER-ELE-2025-003@acer.europa.eu Audience Electricity Transmission System Operators (TSOs), Regional Coordination Centres (RCCs), Nominated Electricity Market Operators (NEMOs), investors, network users, producers, suppliers, new market players, exchanges, balancing providers, Member State public authorities, academics, thinktanks, environmental groups, civic society and other interested parties.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

DFGEB-2012-E-004 FG on Electricy Balancing

DFGEB-2012-E-004 FG on Electricy Balancing Status Closed Open: 25.04.2012 Close: 25.06.2012 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2023_E_06 - Public Consultation on ACER’s Decision on the amendments of Core region electricity intraday capacity calculation methodology

PC_2023_E_06 - Public Consultation on ACER’s Decision on the amendments of Core region electricity intraday capacity calculation methodology Status Closed Open: 04.07.2023 Close: 01.08.2023 Policy area Electricity, Capacity allocation and Congestion management Contact information ACER-ELE-2023-010@acer.europa.eu Audience Interested stakeholders e.g.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2025_E_05 - Public consultation on amendments to Europe's electricity capacity calculation regions

PC_2025_E_05 - Public consultation on amendments to Europe's electricity capacity calculation regions Status Closed Open: 24.07.2025 Close: 03.09.2025 Policy area Capacity calculation and congestion management (CACM); capacity calculation regions (CCRs); electricity bidding zone borders Contact information ACER-ELE-2025-006@acer.europa.eu Audience Transmission system operators (TSOs), electricity industry, traders, national regulators, governments and other relevant stakeholders in the EU and Energy Community.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

​​​​​​PC_2017_R_03 - Public Consultation on the revision of electronic formats for transaction data, fundamental data and inside information reporting

​​​​​​PC_2017_R_03 - Public Consultation on the revision of electronic formats for transaction data, fundamental data and inside information reporting Status Closed Open: 05.10.2017 Close: 08.12.2017 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2021_E_07 Public consultation on the high-level approach for the identification of alternative bidding zone configurations to be considered for the bidding zone review

PC_2021_E_07 Public consultation on the high-level approach for the identification of alternative bidding zone configurations to be considered for the bidding zone review Status Closed Open: 06.07.2021 Close: 03.08.2021 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2021_G_05 Public Consultation on Capacity Offering and Use at the Gas Interconnection Points Located at the Borders of the EU and the Energy Community and within the Energy Community

PC_2021_G_05 Public Consultation on Capacity Offering and Use at the Gas Interconnection Points Located at the Borders of the EU and the Energy Community and within the Energy Community Status Closed Open: 12.05.2021 Close: 30.06.2021 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2023_E_10 - Public consultation on prioritising the removal of barriers to electricity demand response

PC_2023_E_10 - Public consultation on prioritising the removal of barriers to electricity demand response Status Closed Open: 19.12.2023 Close: 02.02.2024 Policy area Electricity demand response Contact information ewpmm@acer.europa.eu Audience Market participants, regulatory authorities, nominated electricity market operators, Member State governments, academics and grid system operators Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2023_E_11 - Public consultation on potential changes to the electricity capacity calculation regions

PC_2023_E_11 - Public consultation on potential changes to the electricity capacity calculation regions Status Closed Open: 05.12.2023 Close: 10.01.2024 Policy area Capacity calculation regions (CCRs); electricity bidding zone borders Contact information ACER-ELE-2023-016@acer.europa.eu Audience Transmission System Operators (TSOs), electricity industry, traders, regulators, governments and other relevant stakeholders in the EU.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2020_E_05 - Public consultation on the methodology establishing a co-optimised allocation process of cross-zonal capacity for the exchange of balancing capacity or sharing of reserves

PC_2020_E_05 - Public consultation on the methodology establishing a co-optimised allocation process of cross-zonal capacity for the exchange of balancing capacity or sharing of reserves Status Closed Open: 17.02.2020 Close: 10.03.2020 Policy area Contact information Audience Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2024_G_03 - Public consultation on amending the network code on capacity allocation mechanisms in gas transmission systems

PC_2024_G_03 - Public consultation on amending the network code on capacity allocation mechanisms in gas transmission systems Status Closed Open: 08.05.2024 Close: 14.06.2024 Policy area Gas network code Contact information gas_cam_nc@acer.europa.eu Audience Gas TSOs and operators of interconnectors, gas network users (traders, suppliers), booking platform operators, energy exchanges Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU

PC_2022_G_06 - Public consultation on the FUNC issue: how to ensure greater flexibility to book firm capacity at interconnection points

PC_2022_G_06 - Public consultation on the FUNC issue: how to ensure greater flexibility to book firm capacity at interconnection points Status Closed Open: 01.07.2022 Close: 18.08.2022 Policy area Gas Capacity Contact information Audience All interested stakeholders Share on: To access social media, you must accept cookies.

European Union Agency for the Cooperation of Energy Regulators (ACER)AvsluttetEU